It was HOT yesterday and, since most of our work was on the roof, we took a 1/2 day. After my dedicated workers left, I taped out the perimeter of bar on the floor to determine where everything was going to be located so I could verify my window locations for framing the next day.
The space seemed so small. I called in an emergency consult, and BW concurred so I requested another 4' be added to the width of the space. My guys, EJ and AJ, were very patient with the request. But for not much more in material costs, I will now have much more room inside to play with.
Framed roof - before the 4' addition |
Framed roof - before the 4' addition |
Framed roof - before the 4' addition |
Thanks for reading. Stay tuned for more progress.